Car Park Shade Structure Re-Roofing – Swan Valley Central
New top hats, purlins and roof sheeting installed to existing car park shade structures.
See Project
BUILDING SERVICES
One call covers any trade. Our large multi-trade team handles the lot, with clear reports and invoicing on every job.
Prefer to talk? (08) 9277 5778
WHAT WE DO
Don’t see your job listed? We cover almost any commercial maintenance job · 20+ years · 20,000+ projects · Fully insured · CM3 qualified
PROPERTY MAINTENANCE
Ongoing upkeep, repairs and planned maintenance for property managers, strata and facilities teams across Perth.
Prefer to talk? (08) 9277 5778
WHAT WE DO
Emergency after hours? Call 1300 501 010 · 4:00pm to 8:00am Mon to Fri, all day Sat and Sun · Commercial clients only
BUILDING SERVICES
One call covers any trade. Our large multi-trade team handles the lot, with clear reports and invoicing on every job.
Prefer to talk? (08) 9277 5778
WHAT WE DO
Don’t see your job listed? We cover almost any commercial maintenance job · 20+ years · 20,000+ projects · Fully insured · CM3 qualified
PROPERTY MAINTENANCE
Ongoing upkeep, repairs and planned maintenance for property managers, strata and facilities teams across Perth.
Prefer to talk? (08) 9277 5778
WHAT WE DO
Emergency after hours? Call 1300 501 010 · 4:00pm to 8:00am Mon to Fri, all day Sat and Sun · Commercial clients only
OUR PROJECTS · PERTH COMMERCIAL MAINTENANCE
CT Building Maintenance carried out a complete bollard replacement, from removing the damaged bollard and footing through to a new in-ground bollard, reinstated bitumen and fresh line marking.
A complete repair from demolition through to final finish, leaving the area safe, functional and ready for use.
CT Building Maintenance looks after bollard installations, concrete repairs and line marking for property managers, facility teams and commercial owners across Perth. Contact us for a free quote.
A new 140 mm x 1800 mm in-ground bollard, set in a new concrete base.
Removing the damaged bollard, footing and surrounding bitumen, excavating, installing the new bollard in concrete, backfilling, reinstating the bitumen and reapplying line marking.
Yes. On this job we reinstated the bitumen and applied yellow line marking to match the existing layout, so the area was ready to use straight away.

New top hats, purlins and roof sheeting installed to existing car park shade structures.

Painting, signage, floor coatings and line marking across multiple car park levels.
A short walk-through of the job, from the problem to the finished result. There are more videos of our commercial work on our YouTube channel.